Completion of the remaining construction works of the K16 Interchange, which include the
construction of six (06) Branches (I, J, K, L, M, N), twelve (12) Service Roads (SR1 , SR2,
SR3, SR6, SR7, SR8, SR9, SR10, SR14, SR15, SR18, SR19), reconstruction of 1.400m of
the PATHE motorway and 800m of the Inner Ring Road of Thessaloniki.
The project also includes the construction of three bridges over the pipeline corridor of
HELLENIC PETROLEUM S.A.