Execution of all the necessary works for the construction of a 7.320m section of the
Rizomylos – Koroni road, which includes a 4.150m new road section that bypasses the
village of Petalidi and a 3.170m section that improves the existing road.
GCA Group Contract
Contractor Representation
Checking and Optimizing the Project Designs
Development of Construction and Asbuild drawings
Proposals and studies for passing through the area of the ancient Koroni Acropolis with
the combination of the construction of a Cut and Cover tunnel approximately 170m long and
the relocation of ancient structures of significant importance (ancient wall, tower, tombs
etc.).