Completion of the remaining construction works of the K16 Interchange, which include the construction of six (06) Branches (I, J, K, L, M, N), twelve (12) Service Roads (SR1 , SR2, SR3, SR6, SR7, SR8, SR9, SR10, SR14, SR15, SR18, SR19), reconstruction of 1.400m of the PATHE motorway and 800m of the Inner Ring Road of Thessaloniki.
The project also includes the construction of two bridges over the pipeline corridor of HELLENIC PETROLEUM S.A.