Project Details

  • Category
    Infrastructure Projects
  • Type
    Road Construction
  • Location
    Serres, Greece
  • Budget
    13.780.000€
  • Contractor
    TEKAL S.A.
  • GCA Group Contract
    2022 - Today
PROJECTS IN PROGRESS

Construction of bridge at Strymonas River

Project Description

The object of the contract is the construction of the new Strymonas river bridge, located in the area between the settlements of Mavrothalassa and Myrkino.

The bridge has seven spans and its deck consists of 42 prefabricated prestressed beams that are 37m long and weigh about 90tn. The total length of the bridge is 278.30m.

A characteristic element of the area of the bridge is the particularly low-strength subsoil on which it is constructed and this is due to the fact that the area used to be Lake Achinos, which was drained in the 1930s. The low-strength subsoil causes difficulties and challenges during construction.

GCA Group Contract

  • Contractor Representation
  • Project Management, Administration and Staffing
  • Checking and Optimizing the Project Designs
  • Development of Construction and Asbuild drawings
  • Construction Works

For further information do not hesitate to contact us

Address

Karaiskaki 19
Karditsa, Greece

Contact
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Facebook
  • Copyright © 2020
  • slumdogteam

bannerallETPA1